{"id":6953,"date":"2010-04-08T15:06:38","date_gmt":"2010-04-08T14:06:38","guid":{"rendered":"http:\/\/www.agrupament.cat\/portal\/?p=6953"},"modified":"2010-04-08T15:07:19","modified_gmt":"2010-04-08T14:07:19","slug":"el-dptop-completa-la-urbanitzacio-de-lentorn-de-lestacio-de-ll9l10-de-bon-pastor","status":"publish","type":"post","link":"https:\/\/www.agrupament.cat\/portal\/2010\/04\/el-dptop-completa-la-urbanitzacio-de-lentorn-de-lestacio-de-ll9l10-de-bon-pastor\/","title":{"rendered":"El DPTOP completa la urbanitzaci\u00f3 de l&#8217;entorn de l&#8217;estaci\u00f3 de l&#8217;L9\/L10 de Bon Pastor"},"content":{"rendered":"<p><strong><a href=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2010\/04\/GenCatOP014.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-6957\" title=\"GenCatOP01\" src=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2010\/04\/GenCatOP014.jpg\" alt=\"\" width=\"214\" height=\"35\" \/><\/a>El Departament de Pol\u00edtica Territorial i Obres P\u00fabliques ha enllestit la reurbanitzaci\u00f3 de l\u2019entorn de la nova estaci\u00f3 de l\u2019L9\/L10 de Bon Pastor, que entrar\u00e0 en funcionament aquest mes d\u2019abril. <\/strong>Aix\u00ed, s\u2019ha recuperat per a la ciutat una \u00e0rea de 3.400 m2 que fins ara restava afectada per les obres.<\/p>\n<p><a href=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2010\/04\/L9-Bon-Pastor1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-6954\" title=\"L9 Bon Pastor1\" src=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2010\/04\/L9-Bon-Pastor1.jpg\" alt=\"\" width=\"800\" height=\"600\" srcset=\"https:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2010\/04\/L9-Bon-Pastor1.jpg 800w, https:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2010\/04\/L9-Bon-Pastor1-300x225.jpg 300w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><br \/>\nImatge de la urbanitzaci\u00f3<\/p>\n<p>La urbanitzaci\u00f3 ha consistit en l\u2019arranjament d\u2019un tram\u00a0 del carrer de Sant Adri\u00e0, entre el carrer d\u2019Enric Sanchis i el carrer de Cretes, amb la col\u00b7locaci\u00f3 d\u2019un nou paviment, l\u2019enjardinament d\u2019alguns espais, la instal\u00b7laci\u00f3 de diferents elements de mobiliari urb\u00e0 i una nova il\u00b7luminaci\u00f3. Els treballs d\u2019urbanitzaci\u00f3 han comportat una inversi\u00f3 de prop de 690.000 euros.<!--more--><\/p>\n<p>El DPTOP ha reobert l\u2019\u00e0rea afectada en superf\u00edcie per les obres de construcci\u00f3 de la nova estaci\u00f3 de l\u2019L9\/L10 de Bon Pastor, que entrar\u00e0 en funcionament aquesta primavera.<\/p>\n<p>Aix\u00ed, s\u2019ha reurbanitzat un tram del carrer de Sant Adri\u00e0, entre el carrer d\u2019Enric Sanchis i el carrer de Cretes, la qual cosa ha perm\u00e8s recuperar una \u00e0rea de 3.400 m2que fins ara quedava afectada per les obres.<\/p>\n<p>Els treballs han consistit en la col\u00b7locaci\u00f3 d\u2019un nou paviment, la plantaci\u00f3 d\u2019arbres i l\u2019enjardinament d\u2019algunes \u00e0rees, la instal\u00b7laci\u00f3 de bancs, papereres i altres elements de mobiliari urb\u00e0, la col\u00b7locaci\u00f3 de nova il\u00b7luminaci\u00f3 i altres obres per a facilitar el drenatge i la canalitzaci\u00f3 d\u2019aig\u00fces en aquest punt.<\/p>\n<p>D\u2019aquesta manera, finalitzen les ocupacions en superf\u00edcie a conseq\u00fc\u00e8ncia d\u2019aquesta obra, i es millora la mobilitat en aquest punt, alhora que es crea una nova \u00e0rea de lleure per a la ciutat. Les obres d\u2019urbanitzaci\u00f3 de l\u2019entorn d\u2019aquesta estaci\u00f3 han comportat una inversi\u00f3 de prop de 690.000 euros.<\/p>\n<p>Aquesta \u00e9s una de les estacions que entraran en funcionament aquest mes d\u2019abril, juntament amb les 3 del ramal de Badalona, on l\u2019arribada del metro tamb\u00e9 comporta la restituci\u00f3 dels carrers contigus a la nova estaci\u00f3. En aquest sentit, a Llefi\u00e0 i La Salut, un cop acabades les obres en superf\u00edcie, s\u2019han arranjat els trams dels carrers dins l\u2019\u00e0rea d\u2019influ\u00e8ncia m\u00e9s propera a l\u2019estaci\u00f3 per retornar-los al seu estat original. Per la seva banda, a l\u2019entorn de l\u2019estaci\u00f3 de Gorg es preveu una transformaci\u00f3 urban\u00edstica m\u00e9s \u00e0mplia, a c\u00e0rrec de l\u2019Ajuntament de Badalona i el Consell Comarcal del Barcelon\u00e8s.<\/p>\n<p><a href=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2010\/04\/L9-Bon-Pastor-acces.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-6955\" title=\"L9 Bon Pastor acces\" src=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2010\/04\/L9-Bon-Pastor-acces.jpg\" alt=\"\" width=\"800\" height=\"600\" srcset=\"https:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2010\/04\/L9-Bon-Pastor-acces.jpg 800w, https:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2010\/04\/L9-Bon-Pastor-acces-300x225.jpg 300w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><br \/>\nAcc\u00e9s<\/p>\n<p><strong>La nova estaci\u00f3 de Bon Pastor<\/strong><br \/>\nParal\u00b7lelament a les obres d\u2019urbanitzaci\u00f3, ja s\u2019ha finalitzat l\u2019estructura i els acabats interiors, de manera que l\u2019estaci\u00f3 ja compta amb tots els elements necessaris per a la seva posada en servei. Ara es duran a terme les proves per validar que tot funcioni correctament.<\/p>\n<p>L\u2019estaci\u00f3 \u00e9s de tipus pou, amb andanes superposades, en comptes d\u2019en paral\u00b7lel, i escales mec\u00e0niques per a connectar els diferents nivells, a m\u00e9s dels 2 ascensors per a persones amb mobilitat redu\u00efda. Compta amb un acc\u00e9s al carrer de Sant Adri\u00e0, amb escales fixes i mec\u00e0niques, que comunica amb el vest\u00edbul principal.<\/p>\n<p>Donar\u00e0 servei al ve\u00efns del barri de Bon Pastor, que fins ara no disposaven de metro, i facilitar\u00e0 l\u2019acc\u00e9s a diversos equipaments com ara el mercat municipal que s\u2019est\u00e0 remodelant, al CAP Bon Pastor i a la biblioteca, al centre c\u00edvic del barri, i al centre comercial de La Maquinista, entre d\u2019altres. Est\u00e0 previst que m\u00e9s de 6.000 persones utilitzin aquesta estaci\u00f3 quan l\u2019L9\/L10 arribi fins a La Sagrera.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>El Departament de Pol\u00edtica Territorial i Obres P\u00fabliques ha enllestit la reurbanitzaci\u00f3 de l\u2019entorn de la nova estaci\u00f3 de l\u2019L9\/L10<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[19],"class_list":["post-6953","post","type-post","status-publish","format-standard","hentry","tag-infraestructures","comments-off"],"_links":{"self":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts\/6953","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/comments?post=6953"}],"version-history":[{"count":2,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts\/6953\/revisions"}],"predecessor-version":[{"id":6958,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts\/6953\/revisions\/6958"}],"wp:attachment":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/media?parent=6953"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/categories?post=6953"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/tags?post=6953"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}