{"id":408,"date":"2008-02-18T22:21:11","date_gmt":"2008-02-18T21:21:11","guid":{"rendered":"http:\/\/www.agrupament.cat\/portal\/?p=408"},"modified":"2008-08-16T08:16:39","modified_gmt":"2008-08-16T07:16:39","slug":"dilluns-vinent-18-de-febrer-es-tancara-temporalment-un-dels-accessos-de-lestacio-de-drassanes","status":"publish","type":"post","link":"https:\/\/www.agrupament.cat\/portal\/2008\/02\/dilluns-vinent-18-de-febrer-es-tancara-temporalment-un-dels-accessos-de-lestacio-de-drassanes\/","title":{"rendered":"Dilluns vinent, 18 de febrer, es tancar\u00e0 temporalment un dels accessos de l\u2019estaci\u00f3 de Drassanes"},"content":{"rendered":"<p>Dilluns vinent, 18 de febrer, es tancar\u00e0 temporalment un dels accessos de l\u2019estaci\u00f3 de Drassanes, de la l\u00ednia 3 de metro, per fer-hi obres de rehabilitaci\u00f3. L\u2019acc\u00e9s que es tanca \u00e9s el de Santa Madrona, mentre que continuaran oberts els de Rambla i Drassanes. Tamb\u00e9 continuar\u00e0 operatiu l\u2019ascensor per a persones amb mobilitat redu\u00efda que comunica el carrer i el vest\u00edbul.<\/p>\n<p>L\u2019acc\u00e9s de Santa Madrona estar\u00e0 tancat unes tres setmanes, durant les quals s\u2019hi faran treballs de reforma. Tota l\u2019estaci\u00f3 est\u00e0 sent objecte de rehabilitaci\u00f3 integral des del desembre passat, dins del programa de modernitzaci\u00f3 de les estacions m\u00e9s antigues o desgastades que porta a terme Transports Metropolitans de Barcelona (TMB). <!--more--><\/p>\n<p>La rehabilitaci\u00f3 consisteix a reconfigurar vest\u00edbuls per aprofitar millor l\u2019espai, substituir paviments, graons, sostres i revestiments de parets, millorar la il\u00b7luminaci\u00f3, renovar la senyalitzaci\u00f3 al p\u00fablic i el mobiliari, i instal\u00b7lar barreres de control del tipus m\u00e9s efectiu. En el disseny arquitect\u00f2nic es procura distribuir els espais per facilitar els fluxos de persones, augmentar la sensaci\u00f3 de lluminositat amb acabats de tonalitats clares i facilitar el manteniment posterior amb l\u2019elecci\u00f3 de materials d\u2019elevada resist\u00e8ncia. <a href=\"http:\/\/www.tmb.net\/ca_ES\/premsa\/notespremsa\/notespremsa.jsp\">El cost d\u2019execuci\u00f3 del projecte \u00e9s d\u20191,8 milions d\u2019euros.<\/a><\/p>\n<p>Barcelona, 15 de febrer de 2008<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dilluns vinent, 18 de febrer, es tancar\u00e0 temporalment un dels accessos de l\u2019estaci\u00f3 de Drassanes, de la l\u00ednia 3 de<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[17,19],"class_list":["post-408","post","type-post","status-publish","format-standard","hentry","tag-afectacions-e-incidencies","tag-infraestructures","comments-off"],"_links":{"self":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts\/408","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/comments?post=408"}],"version-history":[{"count":2,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts\/408\/revisions"}],"predecessor-version":[{"id":640,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts\/408\/revisions\/640"}],"wp:attachment":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/media?parent=408"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/categories?post=408"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/tags?post=408"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}