{"id":15363,"date":"2013-03-22T23:00:59","date_gmt":"2013-03-22T22:00:59","guid":{"rendered":"http:\/\/www.agrupament.cat\/portal\/?p=15363"},"modified":"2013-03-26T14:08:24","modified_gmt":"2013-03-26T13:08:24","slug":"el-departament-de-territori-i-sostenibilitat-tes-ha-completat-avui-els-treballs-de-millora-de-lestacio-de-metro-de-virrei-amat-l5-aquesta-actuacio-que-ha-comptat-amb-una-inversio-de-7-m","status":"publish","type":"post","link":"https:\/\/www.agrupament.cat\/portal\/2013\/03\/el-departament-de-territori-i-sostenibilitat-tes-ha-completat-avui-els-treballs-de-millora-de-lestacio-de-metro-de-virrei-amat-l5-aquesta-actuacio-que-ha-comptat-amb-una-inversio-de-7-m\/","title":{"rendered":"El TES ha completat els treballs a l\u2019estaci\u00f3 de Metro de Virrei Amat (L5)."},"content":{"rendered":"<p><a href=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2011\/02\/TerritoriSostenibilitat.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-9662\" alt=\"TerritoriSostenibilitat\" src=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2011\/02\/TerritoriSostenibilitat.jpg\" width=\"161\" height=\"35\" \/><\/a><a href=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2011\/02\/TMB012.gif\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-9694\" alt=\"TMB01\" src=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2011\/02\/TMB012.gif\" width=\"68\" height=\"50\" \/><\/a><strong>Aquesta actuaci\u00f3, que ha comptat amb una inversi\u00f3 de 7 MEUR, ha perm\u00e8s ampliar el vest\u00edbul del passeig de Fabra i Puig, adaptar-lo a les persones amb mobilitat redu\u00efda i dotar-lo d\u2019un nou acc\u00e9s des de la pla\u00e7a de Virrei Amat.Territori i Sostenibilitat posa en marxa el nou vest\u00edbul adaptat de l&#8217;L5 de Virrei Amat<\/strong><\/p>\n<p><strong>El Departament de TES ha posat avui en servei el nou vest\u00edbul adaptat de l\u2019estaci\u00f3 de l\u2019L5 de Virrei Amat, un cop ha concl\u00f2s les obres de millora que hi ha dut a terme. Els treballs han comportat l\u2019ampliaci\u00f3 del vest\u00edbul del passeig de Fabra i Puig, la seva adaptaci\u00f3 a les persones amb mobilitat redu\u00efda i la construcci\u00f3 d\u2019un nou acc\u00e9s des de la pla\u00e7a de Virrei Amat. Aquesta actuaci\u00f3, que beneficiar\u00e0 els prop de 16.000 passatgers que utilitzen di\u00e0riament l\u2019estaci\u00f3, ha comptat amb un pressupost de 7 MEUR.<\/strong><br \/>\n<!--more--><!--more--><\/p>\n<p>En concret, les obres han incl\u00f2s les millores seg\u00fcents:<br \/>\nAmpliaci\u00f3 i remodelaci\u00f3 del vest\u00edbul del passeig de Fabra i Puig: s\u2019ha ampliat la superf\u00edcie existent, passant dels 200 m2 anteriors als 500 m2 actuals, xifra que suposa m\u00e9s del doble d\u2019espais per als viatgers. A m\u00e9s, s\u2019ha renovat l\u2019arquitectura interior del vest\u00edbul, amb nou paviment i revestiments i noves m\u00e0quines validadores adaptades. L\u2019estaci\u00f3 de Virrei Amat compta amb un altre vest\u00edbul prop del carrer de Felip II.<br \/>\nNou acc\u00e9s adaptat: s\u2019ha habilitat un nou acc\u00e9s, el tercer a aquest vest\u00edbul, des de la pla\u00e7a Virrei Amat. L\u2019acc\u00e9s, adaptat a les persones amb mobilitat redu\u00efda compta amb escales fixes, mec\u00e0niques i un ascensor que connecta l\u2019exterior i el vest\u00edbul. Aix\u00ed mateix, s\u2019han renovat els altres accessos a aquest vest\u00edbul.<br \/>\nTres nous ascensors i escales mec\u00e0niques: a banda del nou ascensor al carrer, s\u2019han instal\u00b7lat 2 m\u00e9s que enllacen el nivell del vest\u00edbul de Fabra i Puig amb les andanes, per a la millora de l\u2019accessibilitat. D\u2019altra banda, s\u2019han eixamplat les escales a les andanes i s\u2019hi ha disposat tamb\u00e9 escales mec\u00e0niques entre els nivells andana i vest\u00edbul.<br \/>\nRenovaci\u00f3 del nivell d\u2019andanes: s\u2019han recrescut les andanes per tal de reduir el desnivell entre andana i combois i millorar l\u2019accessibilitat per a tots els usuaris, alhora que s\u2019hi han disposat els encaminaments per a invidents<br \/>\nNova sortida d\u2019emerg\u00e8ncia: s\u2019ha constru\u00eft una nova sortida d\u2019emerg\u00e8ncia directa a carrer des de l\u2019andana.<br \/>\nUrbanitzaci\u00f3 de l\u2019exterior: s\u2019ha reposat la urbanitzaci\u00f3 existent a la pla\u00e7a de Virrei Amat. Aix\u00ed mateix, s\u2019ha dut a terme la repavimentaci\u00f3 de la cru\u00eflla del passeig Fabra i Puig i l\u2019avinguda Borb\u00f3 i l\u2019eixamplament de la vorera corresponent a la cru\u00eflla del passeig Fabra i Puig i el carrer de Pi i Molist.<\/p>\n<p><a href=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2013\/03\/TES\u00b7L5\u00b7VirreyAmat011.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-15365\" title=\"Interior Vestibul estaci\u00f3 Virrey Amat L5\" alt=\"Fotografia\" src=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2013\/03\/TES\u00b7L5\u00b7VirreyAmat011.jpg\" width=\"700\" height=\"445\" srcset=\"https:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2013\/03\/TES\u00b7L5\u00b7VirreyAmat011.jpg 700w, https:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2013\/03\/TES\u00b7L5\u00b7VirreyAmat011-300x190.jpg 300w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2013\/03\/TES\u00b7L5\u00b7VirreyAmat02.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-15366\" alt=\"Fotografia\" src=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2013\/03\/TES\u00b7L5\u00b7VirreyAmat02.jpg\" width=\"700\" height=\"592\" srcset=\"https:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2013\/03\/TES\u00b7L5\u00b7VirreyAmat02.jpg 700w, https:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2013\/03\/TES\u00b7L5\u00b7VirreyAmat02-300x253.jpg 300w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/a><\/p>\n<p><strong>Accessibilitat a la xarxa de transport p\u00fablic<\/strong><br \/>\nL\u2019obra que ara ha finalitzat forma part del conjunt d\u2019actuacions que el Departament de TES t\u00e9 en marxa per adaptar la totalitat de la xarxa de transport p\u00fablic. En aquest sentit, pel que fa a la xarxa de Metro, recentment va concloure l\u2019adaptaci\u00f3 a persones amb mobilitat redu\u00efda de les estacions de l\u2019L4 de Bogatell i Llacuna. Amb Virrei Amat, ja s\u00f3n 119 les estacions adaptades d\u2019un total de 139 (el 85%).<\/p>\n<p>D\u2019altra banda, TES treballa en la millora de l\u2019accessibilitat en altres estacions, com Zona Universit\u00e0ria (L3) i\u00a0 Collblanc (L5), en el marc de les obres de l\u2019L9; i Passeig de Gr\u00e0cia (L3), en col\u00b7laboraci\u00f3 amb ADIF. Paral\u00b7lelament, t\u00e9 en redacci\u00f3 tots els projectes de les estacions de Metro pendents d\u2019adaptar a persones amb mobilitat redu\u00efda.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Aquesta actuaci\u00f3, que ha comptat amb una inversi\u00f3 de 7 MEUR, ha perm\u00e8s ampliar el vest\u00edbul del passeig de Fabra<\/p>\n","protected":false},"author":4,"featured_media":15366,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[35,19,109,56],"class_list":["post-15363","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","tag-barcelona","tag-infraestructures","tag-l05-vall-dhebron-cornella-centre","tag-metro-barcelona-tmb","comments-off"],"_links":{"self":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts\/15363","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/comments?post=15363"}],"version-history":[{"count":7,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts\/15363\/revisions"}],"predecessor-version":[{"id":15420,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts\/15363\/revisions\/15420"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/media\/15366"}],"wp:attachment":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/media?parent=15363"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/categories?post=15363"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/tags?post=15363"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}