{"id":14231,"date":"2012-08-20T09:00:35","date_gmt":"2012-08-20T08:00:35","guid":{"rendered":"http:\/\/www.agrupament.cat\/portal\/?p=14231"},"modified":"2012-08-20T10:10:08","modified_gmt":"2012-08-20T09:10:08","slug":"es-repren-amb-normalitat-el-servei-a-la-linia-5-de-metro-entre-horta-i-vall-dhebron","status":"publish","type":"post","link":"https:\/\/www.agrupament.cat\/portal\/2012\/08\/es-repren-amb-normalitat-el-servei-a-la-linia-5-de-metro-entre-horta-i-vall-dhebron\/","title":{"rendered":"Es repr\u00e8n amb normalitat el servei a la l\u00ednia 5 de metro entre Horta i Vall d&#8217;Hebron"},"content":{"rendered":"<p><strong><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-9726\" title=\"TMB01\" src=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2011\/02\/TMB013.gif\" alt=\"\" width=\"68\" height=\"50\" \/>Avui, dilluns 20 d\u2019agost, <a href=\"http:\/\/www.tmb.cat\/ca\/detall-linia-metro\/-\/linia\/L5\">s\u2019ha restablert amb normalitat el servei al tram de la l\u00ednia 5 de metro entre Horta i Vall d&#8217;Hebron. <\/a><\/strong>El servei entre aquestes estacions ha estat susp\u00e8s des del 10 d\u2019agost per realitzar tasques de manteniment de la infraestructura de via. A partir de les 5 del mat\u00ed, amb l\u2019inici del servei d\u2019avui dilluns, els trens de la l\u00ednia 5 han tornat a circular amb normalitat entre tots dos extrems de la l\u00ednia, de Cornell\u00e0 Centre a Vall d\u2019Hebron i a la inversa, tal com estava previst.<br \/>\n<!--more--><br \/>\nLa interrupci\u00f3 del servei durant deu dies en aquest tram de la l\u00ednia, de 2,3 quil\u00f2metres de longitud, ha perm\u00e8s executar treballs de condicionament i assentament de la via, com ara l\u2019ajust d\u2019agulles i el manteniment d\u2019elements de fixaci\u00f3 de carrils.<\/p>\n<p>Per reduir les mol\u00e8sties als usuaris durant l\u2019afectaci\u00f3, TMB va habilitar un servei especial d\u2019autobusos amb parada a totes les estacions afectades pel tall amb el mateix horari del metro.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Avui, dilluns 20 d\u2019agost, s\u2019ha restablert amb normalitat el servei al tram de la l\u00ednia 5 de metro entre Horta<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[17,35,43,19,109,225,56],"class_list":["post-14231","post","type-post","status-publish","format-standard","hentry","tag-afectacions-e-incidencies","tag-barcelona","tag-estacions","tag-infraestructures","tag-l05-vall-dhebron-cornella-centre","tag-metro","tag-metro-barcelona-tmb","comments-off"],"_links":{"self":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts\/14231","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/comments?post=14231"}],"version-history":[{"count":2,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts\/14231\/revisions"}],"predecessor-version":[{"id":14234,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts\/14231\/revisions\/14234"}],"wp:attachment":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/media?parent=14231"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/categories?post=14231"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/tags?post=14231"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}