{"id":12018,"date":"2011-10-29T00:10:52","date_gmt":"2011-10-28T23:10:52","guid":{"rendered":"http:\/\/www.agrupament.cat\/portal\/?p=12018"},"modified":"2011-10-29T08:57:54","modified_gmt":"2011-10-29T07:57:54","slug":"afectacions-al-servei-de-la-linia-barcelona-valles-el-cap-de-setmana-del-5-i-6-de-novembre-per-treballs-de-millora","status":"publish","type":"post","link":"https:\/\/www.agrupament.cat\/portal\/2011\/10\/afectacions-al-servei-de-la-linia-barcelona-valles-el-cap-de-setmana-del-5-i-6-de-novembre-per-treballs-de-millora\/","title":{"rendered":"Afectacions al servei de la l\u00ednia Barcelona-Vall\u00e8s el cap de setmana del 5 i 6 de novembre per treballs de millora"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-9480\" title=\"FGC2G\" src=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2011\/01\/FGC2G.gif\" alt=\"\" width=\"88\" height=\"35\" \/>PREVISI\u00d3 (cap de setmana 5 i 6 de nombre)<br \/>\n<strong>El servei de la l\u00ednia L7 (Avinguda Tibidabo) restar\u00e0 interromput i hi haur\u00e0 servei alternatiu especial amb autobusos de TMB que cobriran el trajecte entre les estacions de Gr\u00e0cia i Avinguda Tibidabo.<\/strong><br \/>\n<strong> Tamb\u00e9 es modifiquen els horaris de les l\u00ednies L6 (Reina Elisenda) i S2 (Sabadell).<\/strong><br \/>\n<strong> La l\u00ednia S1 circular\u00e0 amb els horaris habituals.<\/strong><br \/>\nS\u2019aprofitar\u00e0 el tall per avan\u00e7ar en les obres de millora i adaptaci\u00f3 a persones amb mobilitat redu\u00efda de l\u2019estaci\u00f3 de Gr\u00e0cia, i tamb\u00e9 per rehabilitar i refor\u00e7ar una de les agulles de l\u2019estaci\u00f3 de Pla\u00e7a Catalunya.<br \/>\n<!--more--><br \/>\nBarcelona, 28 d\u2019octubre de 2011<br \/>\nLa l\u00ednia Barcelona-Vall\u00e8s d\u2019FGC es veur\u00e0 afectada per un tall de servei a la l\u00ednia L7 (Avinguda Tibidabo) i modificacions d\u2019horaris en les l\u00ednies L6 (Reina Elisenda) i S2 (Sabadell) el cap de setmana del 5 i 6 de novembres. El motiu d\u2019aquestes afectacions puntuals s\u00f3n els treballs de millora i adaptaci\u00f3 a persones amb mobilitat redu\u00efda que est\u00e0 executant el Departament de Territori i Sostenibilitat a l\u2019estaci\u00f3 de Gr\u00e0cia, i tamb\u00e9 la rehabilitaci\u00f3 d\u2019una de les agulles de l\u2019estaci\u00f3 de Pla\u00e7a Catalunya, concretament la que regula la circulaci\u00f3 de les vies 3, 4 i 5, per on habitualment circula el Metro del Vall\u00e8s.<\/p>\n<p>Concretament, el servei del cap de setmana del 5 i 6 de novembre a la l\u00ednia del Vall\u00e8s ser\u00e0 el seg\u00fcent:<br \/>\n<strong>L6 (Reina Elisenda)<\/strong>: es modificar\u00e0 la circulaci\u00f3 de trens segons els horaris que s\u2019adjunten en el quadre adjunt.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-12020\" title=\"FGC Esquema_tall_GR-TB\" src=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2011\/10\/FGC-Esquema_tall_GR-TB.jpg\" alt=\"\" width=\"800\" height=\"262\" srcset=\"https:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2011\/10\/FGC-Esquema_tall_GR-TB.jpg 800w, https:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2011\/10\/FGC-Esquema_tall_GR-TB-300x98.jpg 300w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><br \/>\n<span style=\"color: #000000; background-color: #ffff00;\"><strong>L7 (Avinguda Tibidabo): supressi\u00f3 del servei. <\/strong>Es realitzar\u00e0 servei alternatiu especial amb autobusos de TMB entre les estacions de Gr\u00e0cia i Av.Tibidabo, amb parada a les estacions interm\u00e8dies.<\/span><br \/>\n<strong>S1 (Terrassa):<\/strong> tots els trens circularan amb normalitat.<br \/>\n<strong>S2 (Sabadell): en direcci\u00f3 Sabadell, el tren amb horari de sortida de l\u2019estaci\u00f3 de Pl.Catalunya a les 8.45h, sortir\u00e0 a les 8.50h <\/strong>La resta de trens circularan amb l\u2019horari habitual. <strong>En direcci\u00f3 Barcelona, entre les 9.03h i les 21.03h (horaris de sortida de Sabadell Rambla) efectuaran sortida 5 minuts m\u00e9s tard.<\/strong><\/p>\n<p><strong>Horaris L6 per al cap de setmana del 5 i 6 de novembre:<\/strong><br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-12019\" title=\"FGC Horari L6_tall_GR-TB\" src=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2011\/10\/FGC-Horari-L6_tall_GR-TB.jpg\" alt=\"\" width=\"800\" height=\"556\" srcset=\"https:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2011\/10\/FGC-Horari-L6_tall_GR-TB.jpg 800w, https:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2011\/10\/FGC-Horari-L6_tall_GR-TB-300x208.jpg 300w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><br \/>\nAmpliaci\u00f3 i adaptaci\u00f3 a PMR<br \/>\nLa supressi\u00f3 del servei de l\u2019L7 permetr\u00e0\u00a0 executar la instal\u00b7laci\u00f3 d\u2019una diagonal a les vies de l\u2019estaci\u00f3 de Pla\u00e7a Molina que permetr\u00e0 minimitzar les afeccions al servei d\u2019FGC previstes en fases posteriors en el projecte de remodelaci\u00f3 de l\u2019estaci\u00f3 de Gr\u00e0cia. Concretament, aix\u00f2 permetr\u00e0 mantenir el servei de l\u2019L7 quan s\u2019executin els treballs de despla\u00e7ament d\u2019una de les vies actuals de l\u2019estaci\u00f3.<\/p>\n<p>Les obres de remodelaci\u00f3 i millora de l\u2019estaci\u00f3 de Gr\u00e0cia, que es troben en marxa des del gener de 2011, serviran per adaptar l\u2019estaci\u00f3 a persones amb mobilitat redu\u00efda, amb la col\u00b7locaci\u00f3 de tres nous ascensors per facilitar la mobilitat entre els diferents nivells. Precisament, per encabir els elevadors, cal ampliar les andanes originals, la qual cosa obliga a modificar el tra\u00e7at de les dues vies laterals de l\u2019estaci\u00f3 (una es despla\u00e7a i l\u2019altra se suprimeix).<\/p>\n<p>A m\u00e9s, es millorar\u00e0 la comoditat dels viatgers en els seus despla\u00e7aments, at\u00e8s que s\u2019ampliaran els espais i tamb\u00e9 es modernitzar\u00e0 l\u2019arquitectura interior del vest\u00edbul i les andanes. En aquest sentit, la superf\u00edcie del vest\u00edbul s\u2019incrementar\u00e0 dels 250 m2 actuals fins a aproximadament 1.500 m2.<\/p>\n<p>L\u2019actuaci\u00f3 en marxa que compta amb un pressupost de 29,3 MEUR a c\u00e0rrec de TABASA, est\u00e0 cofinan\u00e7ada amb fons europeus mitjan\u00e7ant el programa de Competitivitat Feder Catalunya 2007-2013.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>PREVISI\u00d3 (cap de setmana 5 i 6 de nombre) El servei de la l\u00ednia L7 (Avinguda Tibidabo) restar\u00e0 interromput i<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[17,35,43,47,6,19],"class_list":["post-12018","post","type-post","status-publish","format-standard","hentry","tag-afectacions-e-incidencies","tag-barcelona","tag-estacions","tag-fgc-ferrocarrils-de-la-generalitat-de-catalunya","tag-informacio-de-caracter-general","tag-infraestructures","comments-off"],"_links":{"self":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts\/12018","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/comments?post=12018"}],"version-history":[{"count":2,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts\/12018\/revisions"}],"predecessor-version":[{"id":12022,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts\/12018\/revisions\/12022"}],"wp:attachment":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/media?parent=12018"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/categories?post=12018"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/tags?post=12018"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}