{"id":11239,"date":"2011-07-13T23:55:40","date_gmt":"2011-07-13T22:55:40","guid":{"rendered":"http:\/\/www.agrupament.cat\/portal\/?p=11239"},"modified":"2011-07-14T08:26:43","modified_gmt":"2011-07-14T07:26:43","slug":"acord-per-a-la-implantacio-de-les-connexions-ferroviaries-provisionals-del-port-de-barcelona","status":"publish","type":"post","link":"https:\/\/www.agrupament.cat\/portal\/2011\/07\/acord-per-a-la-implantacio-de-les-connexions-ferroviaries-provisionals-del-port-de-barcelona\/","title":{"rendered":"Acord per a la implantaci\u00f3 de les connexions ferrovi\u00e0ries provisionals del Port de Barcelona"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-11241\" title=\"logoMPT\" src=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2011\/07\/logoMPT.gif\" alt=\"\" width=\"155\" height=\"35\" srcset=\"https:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2011\/07\/logoMPT.gif 155w, https:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2011\/07\/logoMPT-150x35.gif 150w\" sizes=\"auto, (max-width: 155px) 100vw, 155px\" \/>Despr\u00e9s d\u2019una reuni\u00f3 aquest mat\u00ed a la <strong>Delegaci\u00f3 del Govern a Catalunya<\/strong><br \/>\n<strong>\u2022 Avui s\u2019ha arribat a l\u2019acord que permetr\u00e0 la connexi\u00f3 provisional amb la nova Terminal Catalunya del Port de Barcelona al 2012<\/strong><br \/>\n<strong>\u2022 L\u2019obra ferrovi\u00e0ria de l\u2019enlla\u00e7 estar\u00e0 finan\u00e7ada pel Ministeri de Foment<\/strong><br \/>\n<!--more--><br \/>\nBarcelona, 13 de juliol de 2011<br \/>\nEl Delegat del Govern a Catalunya, Joan Rangel, ha presidit aquest mat\u00ed una reuni\u00f3 a la seu de la Delegaci\u00f3 del Govern per acordar, entre totes les parts implicades, una soluci\u00f3 a les connexions provisionals ferrovi\u00e0ries del Port de Barcelona que permetin donar servei a la nova Terminal Catalunya. A la trobada hi han assistit representants del Ministeri de Foment, de la Generalitat de Catalunya, de l\u2019Ajuntament de Barcelona, del Port de Barcelona, del Consorci de la Zona Franca, d\u2019Adif i de FGC.<br \/>\nEls assistents han donat el vist-i-plau, per unanimitat, a la soluci\u00f3 considera m\u00e9s adient, denominada \u201cCan Tunis-Est\u201d. Consisteix en accedir al Port pel carrer 4 de la Zona d\u2019Activitats Log\u00edstiques (ZAL) fins connectar amb la via que transcorre en paral\u00b7lel al carrer A de la Zona Franca, travessant Can Tunis, on connectar\u00e0 amb el ramal ferroviari de mercaderies del Llobregat.<br \/>\nAquesta proposta compleix amb els objectius d\u2019un termini redu\u00eft, efic\u00e0cia log\u00edstica i menor afectaci\u00f3 al pol\u00edgon de la Zona Franca.<br \/>\nEn la reuni\u00f3 s\u2019ha destacat que aquesta soluci\u00f3 provisional haur\u00e0 d\u2019estar finalitzada per l\u2019entrada en servei de la nova Terminal Catalunya del Port de Barcelona, d\u2019aqu\u00ed a 12 mesos.<br \/>\nAix\u00ed mateix, tamb\u00e9 s\u2019ha acordat redactar un estudi per al possible \u00fas complementari de la infraestructura de Ferrocarrils de la Generalitat de Catalunya.<br \/>\nFinalment, s\u2019ha acordat tamb\u00e9 la constituci\u00f3 d\u2019un grup t\u00e8cnic, liderat pel Port de Barcelona, que redactar\u00e0 l\u2019estudi de la mobilitat generada per les noves connexions ferrovi\u00e0ries.<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-11240\" title=\"CanTunisEst\" src=\"http:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2011\/07\/CanTunisEst.png\" alt=\"\" width=\"577\" height=\"595\" srcset=\"https:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2011\/07\/CanTunisEst.png 577w, https:\/\/www.agrupament.cat\/portal\/wp-content\/uploads\/2011\/07\/CanTunisEst-290x300.png 290w\" sizes=\"auto, (max-width: 577px) 100vw, 577px\" \/><br \/>\n<span style=\"background-color: #000080; color: #ffffff;\">Esquema de la soluci\u00f3 \u201cCan Tunis-Est\u201d (marcada en groc)<\/span><br \/>\nA la reuni\u00f3, presidida per Joan Rangel, han assistit entre altres:<br \/>\n\u2022 Carlos Mar\u00eda Ju\u00e1rez Colera, Director General d\u2019Infraestructures Ferrovi\u00e0ries del Ministeri de Foment.<br \/>\n\u2022 Ricard Font Hereu, Director General de Transports i Mobilitat de la Generalitat de Catalunya.<br \/>\n\u2022 Antoni Vives i Tom\u00e0s, Tercer Tinent d\u2019Alcalde de l\u2019Ajuntament de Barcelona.<br \/>\n\u2022 Sixte Cambra, President del Port de Barcelona.<br \/>\n\u2022 Ramon Molist, Director d\u2019Explotaci\u00f3 del Consorci Zona Franca.<br \/>\n\u2022 Luis L\u00f3pez Ruiz, Director General de Desarrollo Estrat\u00e9gico de Adif.<br \/>\n\u2022 Pere Calvet i Tordera, Director General de FGC.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Despr\u00e9s d\u2019una reuni\u00f3 aquest mat\u00ed a la Delegaci\u00f3 del Govern a Catalunya \u2022 Avui s\u2019ha arribat a l\u2019acord que permetr\u00e0<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[35,47,19,60,69,72],"class_list":["post-11239","post","type-post","status-publish","format-standard","hentry","tag-barcelona","tag-fgc-ferrocarrils-de-la-generalitat-de-catalunya","tag-infraestructures","tag-mercaderies","tag-mitva-ministerio-de-fomento","tag-renfe-operadora","comments-off"],"_links":{"self":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts\/11239","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/comments?post=11239"}],"version-history":[{"count":2,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts\/11239\/revisions"}],"predecessor-version":[{"id":11243,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/posts\/11239\/revisions\/11243"}],"wp:attachment":[{"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/media?parent=11239"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/categories?post=11239"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.agrupament.cat\/portal\/wp-json\/wp\/v2\/tags?post=11239"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}